欧美军警gay巨大粗长,国产大片资源中文字幕,午夜亚洲国产理论片2020,亚洲色少妇熟女11p

歡迎進入山東恒能環(huán)保能源設備有限公司

熱線電話

0531-69953988

分類導航
產品展示
聯(lián)系我們
山東恒能環(huán)保能源設備有限公司

聯(lián)系電話:18678860671

服務熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿易試驗區(qū)濟南片區(qū)孫村街道經十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

沼氣凈化脫硫裝置的運行維護!

沼氣凈化裝置的運行維護應符合下列規(guī)定:

The operation and maintenance of biogas purification device shall meet the following requirements:
1、應定期排出脫水、脫硫裝置中的領凝水。當室外溫度接近0℃時,應每天排除冷凝水,排水時應防止沼氣泄漏。
1. The condensate water in dehydration and desulfurization unit shall be discharged regularly. When the outdoor temperature is close to 0 ℃, the condensate water should be drained every day, and the leakage of biogas should be prevented during drainage.
2、生物脫硫啟動運行正常后,應定期檢查脫硫前后硫化氫濃度變化,硫化氫去除率應滿足后端工藝要求。當發(fā)現脫硫效率明顯下降時,應及時補充循環(huán)營養(yǎng)液。塔內填料應6-12個月清洗1次。
2. After the start-up and operation of biological desulfurization are normal, the change of hydrogen sulfide concentration before and after desulfurization should be checked regularly, and the hydrogen sulfide removal rate should meet the requirements of back-end process. When it is found that the desulfurization efficiency is obviously decreased, the circulating nutrient solution should be supplemented in time. The packing in the tower should be cleaned once every 6-12 months.
3、應定期檢查干法脫硫塔前后硫化氫濃度、沼氣壓力變化,當達不到設計要求時應更換脫硫劑或進行脫硫再生。
3. The change of hydrogen sulfide concentration and biogas pressure before and after the dry desulfurization tower should be checked regularly. When the design requirements are not met, the desulfurizer should be replaced or the desulfurization regeneration should be carried out.
                       沼氣脫硫
4、干法脫硫塔再生應符合下列規(guī)定:
4. Regeneration of dry desulfurization tower shall meet the following requirements:
1).當采用塔內脫硫劑再生時,應關閉沼氣進出口閥,打開旁通管道和放散管路閥門。
1) When the desulfurizer in the tower is used for regeneration, the inlet and outlet valves of biogas should be closed, and the valves of bypass pipeline and discharge pipeline should be opened.
2).當采用在線脫硫劑再生時,應根據沼氣中硫化氫含量確定空氣摻混量及空氣流速,塔內溫度應低于70℃,脫硫塔出口處沼氣中氧含量應小于1%;
2) When online desulfurizer regeneration is used, the air mixing amount and air flow rate should be determined according to the content of hydrogen sulfide in biogas. The temperature in the tower should be lower than 70 ℃, and the oxygen content in biogas at the outlet of desulfurization tower should be less than 1%;
3).脫硫劑進行2次~3次再生后應及時更換,更換脫硫劑時操作人員應戴防毒面具,室內應進行通風;
3) The desulfurizer should be replaced in time after 2 ~ 3 times of regeneration. When replacing the desulfurizer, the operators should wear gas masks, and the room should be ventilated;
4).廢脫硫劑的處置應符合環(huán)境保護的要求。
4) The disposal of waste desulfurizer should meet the requirements of environmental protection.

相關產品 我們的存在,是為了更好的服務于沼氣等可燃氣體凈化及利用行業(yè)
亚洲国产成人精品无码区| 午夜福利影院| 好男人影视在线www官网| 国产一区二区三区在线观看| julia无码中文字幕在线视频| 嫖妓大龄熟妇正在播放| 午夜福利试看120秒体验区| 国产jk精品白丝av在线观看| 国产又爽又黄无码无遮挡在线观看| 免费观看全黄做爰大片| 精品人妻av一区二区三区| 最好看2019高清中文字幕视频| 日本少妇做爰全过程毛片| 中文字幕无码亚洲字幕成a人| 日韩精品乱码AV一区二区| 猛烈顶弄h禁欲医生h怀孕| 色欲av综合av在线av| 亚洲欧美精品无码一区二区三区| 精品久久久久久久无码人妻热| 女人高潮叫床污话| 久久久久久午夜成人影院| xx性欧美肥妇精品久久久久久| 47最大但人文艺术摄影| 精品人妻av一区二区三区| 黑人50厘米全部进去| 女教师の爆乳bd在线观看| 免费网站看sm调教打屁股视频| 精品一二三区久久aaa片| 五级黄高潮片90分钟视频| 国产精品无码久久久久不卡| 成年免费视频黄网站在线观看| 强制高潮18xxxxhd日韩| 无码国产av精品一区二区| 性做久久久久久久久不卡| 国产毛片久久久久久国产毛片| 男人狂躁进女人免费视频vr| 妻子4免费完整版中文版| 中文人妻av久久人妻水| 精品少妇人妻av一区二区| 快穿名器高h喷水荡肉爽文| 三年片在线观看免费观看大全|