欧美军警gay巨大粗长,国产大片资源中文字幕,午夜亚洲国产理论片2020,亚洲色少妇熟女11p

歡迎進入山東恒能環(huán)保能源設備有限公司

熱線電話

0531-69953988

分類導航
產品展示
聯(lián)系我們
山東恒能環(huán)保能源設備有限公司

聯(lián)系電話:18678860671

服務熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿易試驗區(qū)濟南片區(qū)孫村街道經十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

冷卻塔安裝要求

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應根據(jù)設備的各種條件,考慮其安裝位置的地面及其荷載能力,同時也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時應注意冷卻塔的基礎按規(guī)定的尺寸預埋好水平鋼板,各基礎點的標高應在同一標高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應放置水平。水塔在施工安裝時,為防止壓壞底盤,施工人員應踏在底盤的加強筋上,在安裝塔外殼、底盤等纖維件時,為防止外殼底盤等變形可先穿螺釘,而后依次逐漸緊固,在確認底盤不變形,附近干凈、干燥的條件下,為避免使用時漏水可在接觸處鋪設纖維氈及涂樹脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風不良和出現(xiàn)濕空氣回流的場合,須安裝在通風良好的場所。否則將會降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經冷卻降溫后從塔底集水盤向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時,應根據(jù)施工圖指明的坐標位置就位,并應找平找正,設備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.

相關產品 我們的存在,是為了更好的服務于沼氣等可燃氣體凈化及利用行業(yè)
18禁喷水流白浆自慰视噜噜噜| chinese农村老妓女| 久久免费看少妇高潮a片| 久久久精品人妻无码专区不卡| 老师上课没戴奶罩看到奶头| 亚洲av无码乱码在线观看富二代| 国产人妻丰满熟妇嗷嗷叫| 自拍偷在线精品自拍偷无码专区| 张柏芝殖器十二图片| 中文字幕无码他人妻味| 免费在线黄色电影| 欧美国产高清欧美内衣办| 亚洲熟妇久久国产精品| a片做爰片仑理片免费看午夜蝴蝶| 亚洲精品国产偷五月天丁香| 成人a片产无码免费视频| 国产女人高潮叫床男人桶到爽| 国语对白刺激真实精品| h动漫在线观看| 強姦亂倫中文字幕在線觀看| 黄页网址大全免费| 97在线国内自拍视频| 日韩性做爰免费a片aa片| 疯狂做受xxxx高潮欧美日本| b站免费版入口| 挺进毛还没长稚嫩的小花苞网种| 亚洲最大中文字幕无码网站| 猫咪av成人永久网站在线观看| 亚洲国产精品无码久久久老少| 亚洲国产精品日韩AV专区| 人妻熟人中文字幕一区二区| a片做爰片仑理片免费看| 亚洲精品国产偷五月天丁香| 极品少妇高潮啪啪av无码| 日韩中文字幕无码高清毛片| 国产三级农村妇女系列| 熟妇少妇任你躁在线无码| 女人扒开屁股桶爽30分钟| 高清dvd碟片 播放| 国模无码一区二区三区| 40岁的女人私密很紧致|